Planning Blog: Location, Cast, Safety, Schedule, and Backup Plan

Welcome back guys, today I'll be talking about my location, my cast, safety, the schedule for my project, and the backup plan.

Location

As for the location, I'm going to be traveling to Massachusetts soon, so I'll be filming both inside and outside the hotel as well as in my room for some parts.

Cast

Detective James- Hansen

Mr. Walker- Jake

Narrator- Hansen

Victim 1- Lily

Victim 2- Unknown for now

Victim 3- Geathane 

Dr. Syringe- Hansen 

Masked man- Chris

Hotel receptionist- Unknown for now

Safety

I will be using fake props, like a fake gun to resemble real items. I will be using a red marker in instances where the victim has a wound or anything similar. Also to being watched the entire time, we will have a first aid kit available in case we fall too hard.

Schedule

I want to finish all the planning, outfits, and props by February. Pre trip filming will be done first scene 6, 7, 8 and 24, which means early February. Since the trip takes place from February 16 to February 20, I will be filming roughly 6 scenes every day. After the trip from February 25th to March 5th, I will be putting the footage together and editing it all.

Backup Plan

Should I be unable to travel on the trip, I will film in a park, at my house, and at a store, also if I am short on actors, I will cut some of the characters out. Stay tuned for my next blog where I’ll unravel even more mysteries about making an opening scenes video. Trust me; you won't want to miss it.



Comments

Popular posts from this blog

Storyboard